WORK MEASUREMENT

TIMELY, QUALITY INDUSTRIAL ENGINEERING TO BUILD YOUR BUSINESS.

TIME STUDIES

TIME STUDY.PNG

SEAMLESS IE’s are on site filming: process, operator, equipment, and materials.

Film is analyzed, indexed, and measured producing these tools: Gantt Chart, Summarized Operation Elements, Value Stream Map, Work Distribution, Ergonomic Stress Analysis, Simultaneous Work

Comparison, Work Instruction, and PFMEA.

SEAMLESS IE delivers balanced operator functions for more efficient work.

 

WORK INSTRUCTION

wrk instruction.png

Our IE’s develop clear work instructions in Excel based on videos & pictures of facility, equipment, & descriptions of processes. If you have a preferred format, we match it. Our outputs are designed to your work environments and your needs. They can include the following:

Printable Work Instructions for posting at work stations

  • Digital Work Instructions on mobile device, and desktop computers

  • Video of Process Steps with ability to replay

  • Photograph

  • Audio/Video

  • Multi-lingual

  • LINE BALANCE

  • FACILITY LAYOUT

  • PROCESS MAPPING

  • OPEN LOG ISSUES


DEDICATED TO BETTER PROCESSES